Abstract Install bracket is based on air conditioning of buildings, drainage, strong and weak electricity system, due to the involved
system, the complex pipeline, design drawings information not fully, and bracket installed on building the main structure of
the strong dependence, subsequent installation when increase the difficulty of installation, waste installation space. Using BIM Technology
are effectively integrated with the deepening of the design, in advance of the electromechanical system simulation installation
and solve the difficulties in construction, pipeline and the scaffold material saving, increase the building height, the collision detection
of the pipeline. Visualization of the collaborative design changes, is conducive to the professional for further deepening of
the design, construction procedure is simplified, more conducive to the construction site management and shorten the construction
period, thereby saving cost. This paper uses BIM technology to support the installation, design and construction of the integrated optimization,
visual simulation are described.
|