摘要
联通初期尤其是合并前的网通为了快速投入运营,大多地市采取租赁的方式进行机房建设。随着联通自身发
展和机房扩容、租赁合同难续约等等,此类机房逐步被割接搬迁,本文对某具体机房设备搬迁案例及流程进行分析。
Abstract
In the early stage of China Unicom, especially before the merger of China Netcom, in order to quickly put into operation,
most of the cities lease the machine rooms. With the development of China Unicom, the expansion of machine room, and the
rental contract renewal and so on, the machine rooms are gradually cutover and relocated. This paper analyzes the process of a specific
machine room equipment relocation cases.
关键词
机房搬迁 /
传输 /
数据
Key words
engine room relocation /
transmission /
data
潘登高.
浅析某通信机房设备整体搬迁案例[J]. 电脑与电信. 2015, 1(6): 48-50
Pan Denggao.
Analysis on the Case of Communication Room Equipment Relocation[J]. Computer & Telecommunication. 2015, 1(6): 48-50